Thursday, 20 September 2012

Server Sizing..was really easy Part-1



I hear this word very frequently "How do i size my server Hardware"- well folks that's the tricky one!!... Not to forget , Sizing for Virtual Hosts depends on lots of other factors so we will talk about that later :).. lets talk about standalone servers as of now.


some guidelines before we deep dive into this topic 


      • correctly proposition CPU & RAM - You may find people sizing single CPU with 96GB of RAM
      • Prefer high density CPUs to save on Hosting Cost sometimes Licensing cost and at the same time you have multiple cores on single socket - (AMD Processor are really good if you are looking for high density CPU cores on single socket - it can go up 16 Cores single Socket , isn't that Amazing!!) 
      • Always look for cache size
      • Form Factor is another Point to consider
      • Always look for Flash Based Raid Controllers instead of Battery Based
      • Ensure you have sufficient expansion slots to scale out if needed in future.
      • Ensure you take KVM license with Virtual Media support else you will be in problem if you are doing remote installation. Vendor would generally give you basic license which allows OOB (out of Box) access.
      • Budget (Most important)

Alright!!! - After all above take a look at following points as well

so what Next i should do :-

      • Understand Application architecture
      • If your application is CPU or Memory Intensive
      • How Many Disk IOPS you need
      • Kind of Raid Level you need for OS and Data Drives
      • Whether the application is web Based or Client/Server Architecture Based
      • What will be the peak hour Network usage
Now, you may ask how to get all this information ? Well.. Most of it would be available with application vendors.

Now lets talk about what can enable you to properly size the hardware whether you have above information or Not.


      • for Microsoft Apps (Exchange/SQL/AD/SharePoint etc) - you can get Microsoft Sizing tool on web or its Bundled with application package.
      • Oracle/DB2 - There are again sizing tools available on respective vendor website.
      • For SAP instances :- This is the tricky one.. SAP provides QuickSizer tool to size Hardware for SAP instances - (Not freely available you need to be SAP partner and provide all project details before they allow you to use QuickSizer)
Apart from all above :- Most of the Hardware Vendors would provide you tools to do sizing. HP/Dell/Cisco/IBM - They all have sizing tools available on their respective sites and the good part is that, these tools are intelligent enough to understand application Architecture. Download some of them from following link and keep them handy.. :)

Hope this was informative....wait for Part-2

Cheers!!

Pankaj


  

Form Factor.. Is it really Difficult ?



Many a times its difficult to decide on form factor of servers, Folks working on DC Migration/Build/Consolidation projects would generally ask you , "What Kind of server i should suggest to customer" , Well it depends on Multiple factors.. and not very easy to proposition correct Made/Model/Density as per business requirements. People end up with High Density Blade centers where Rack server would have met the requirement and vice-versa. Following are some of the tips which can help you decide whether i should propose Blades or Rack Servers.


Propose Rack Servers When :-
      •  Branch Office and Small Data Rooms -Because Blade Center will take 8 to 10 Units depending on Make/Model with Power requirement from 3.5 KVA to 5 KVA with High Cooling requirements and you may not have such infrastructure at remote sites.
      •  Large DAS (Direct Attached Storage) Required - Generally Blade Servers are built on High Density Architecture and may not have more than 4 Slots for HDD. 
      •  More than 4 CPU Socket required - Majority of Blades would come with 2 or 4 sockets depending on Half/Full Height , You may have a workload which requires more than 4 sockets to operate.
      • 4. Serial/USB/ Port Needed for Dongle connection or extenal device connection - Important factor to consider when you have App License on serial Device or USB device.

Propose Blade Servers When :-

      •  Space and facility Consolidation - Major driving factor to save cost on Power/Space/Colling
      •  Unified Management :- Generally Blade centers comes with Unified Management Modules to provide centralized Management , Although you can buy third party unified management solution for Rack servers but that's the additional investment.
      •  TCO on Power & Cooling - Modern Blade centers are equipped with technology which reduces power and cooling requirements. sometimes if you compare the Hosting cost of the server with actual price of the server itself , Hosting cost will be high. Talk to SunGard or Global Logic or other DC hosting providers :) 
      •  Cabling Reduction Requirement :- This is another important driving factor. Typically you will have 5 Cables running out of rack servers (1 for iLO/dRack , 2 for Production Network , 2 FC cables for SAN connectivity if SAN storage is required), Number of LAN cable may increase depending on traffic separation and other factor. Blade Servers IO is typically  consolidated and it uses High density BackPlane inside the chassis to communicate with edge switches. HP c7000 can provide 40GB LAN & 32GB SAN connectivity with merely 8 Cables to 16 Half height blades or 8 Full height, Cisco UCS further reduces the cable requirements by 50% as compare to HP (If you are using pass-throughs then no benefits on cabling sure :)) . Having said that if you don't want your data center to look at a "Forest" then cable reduction is important.Look at the picture below if you don't trust me
      •  Stateless Server Requirement  :- Lets first Understand what is "State" , it means Identity of the servers Hardware which includes (UID, MAC Address & WWPN Number if it has HBA) - This state is used to define server access to network Layer and storage layer. Now think of a scenario where server Hardware dies and you got Brand new box.  well.. you as server admin have to provide new state of the server  to Network & Storage folks so that that can make changes at their end  access to Storage & Network can be restored. This all requires time (typically 4 to 6 Hrs - this does not include hardware landing/Racking Stacking in DC). Business can't afford 4-6 Hrs of downtime for Mission Critical workload therefore they need some solution to abstract this so called state from the hardware..... well and answer is you got it :) correct!! if not contact me.

      •  Fast and Dymanic provisioning - Last but not the least, today we are talking about end to end provisioning of servers in 5 Minutes to 1 Hrs. Its not Possible until you have Mobility & Hardware abstraction. Blade centers are capable of doing all this.


I hope this post was informative, and may help you to some degree.


Next Post :- I am going to write about different  Hardware offerings from HP/Dell/IBM/Cisco...